Workshop Order Review completed with no action

Workshop Order Review · noop · complete

Filter2mode:review mode:live
All recorded Export JSON
github-actions[bot]

published Aug 17, 2026, 6:29 AM · updated Aug 17, 2026, 6:29 AM

Workshop Order Review

All 54 heuristic findings verified as false positives or intentional design patterns. The 3 detected cycles are: (1) 07/07d — intentional error-recovery bidirectional link explicitly documented in Before You Start; (2) 05/05b — normal prerequisite/next-step relationship, not a true cycle; (3) 02a/side-quest-02-01 — alternative setup paths, not sequential. The capability_before_provider and missing_prerequisite_link findings are false positives: before_links correctly gate environment-reference on prior setup steps, gh aw compile references in step 05 are conceptual examples not runnable commands, and gh repo clone in side-quest-02-01 follows gh auth login within the same file. No real ordering problems confirmed; no issue warranted.

Generated from Workshop Order Review · 45 AIC · ⊞ 4.8K ·